EOLE: Extension of the RER E (Nanterre, France)

As part of the extension of the RER E (EOLE), an installation was carried out in Nanterre to create a soft bond (pedestrian/bicycle path) under the railway infrastructures, with a green access ramp.

Background & purpose

  • Create a ramp adjacent to the railway embankment to ensure smooth traffic continuous and comfortable.
  • Integrate the work into its environment thanks to a green wall.

Technical challenges

  • Interface constraints with a major railway structure (SNCF)
  • Rainwater management: an infiltration solution was studied, then adapted according to the stability constraints of the embankment (establishment of a management/discharge device depending on the project)
  • Coordination of the site with the adjacent structures, in particular the installation of Metallic bridge Above the massif

Solutions implemented

  • Realization of a reinforced ground embankment whose wall is a ATALUS® type green wall, made of draining materials and placed on the ground in place (depending on the geotechnical configuration)
  • The Metallic bridge Has been pushed/put in place above ATALUS reinforced frame

Result

An access ramp functional, stable and integrated into the landscape, at the service of a smooth connection in dense urban areas, demonstrating the interest of green support for a railway infrastructure project.

Speakers

  • Project owner/Project manager: SNCF
  • Business: Tinel (for Eiffage Civil Engineering)
  • Design office: Sepia GC
  • SPS coordinator: Apave